The Scheduling calendar

Week, month and agenda views, navigation, metrics and job colours.

Scheduling is the team calendar. It shows who is doing what, when, and where.

Choosing a view

Three view buttons sit in the top-right:

  • Week — a seven-day grid with hourly rows. Best for dispatching and seeing gaps in a crew's day.
  • Month — a full month, with each job as a coloured bar. Best for workload at a glance.
  • Agenda — a simple chronological list. Best for reading quickly or on a small screen.

Moving around

  • The and arrows step back and forward one period
  • Today returns to the current date
  • The date range and timezone are shown beside the arrows

The timezone is your workspace timezone, not your browser's — so everyone on the team sees the same schedule.

The metrics strip

Four counts sit under the header and update with the period you're viewing:

Metric Meaning
Scheduled jobs Jobs booked in this period
Allocated hours Total crew hours committed
Unassigned Jobs with no team member — these need attention
Cancelled Jobs cancelled in this period

Unassigned is the one to watch. A job with no crew will not get done.

Display controls

Three buttons sit between the view switcher and Create Job:

  • A panel toggle that hides the left filter panel
  • A full-screen toggle
  • A clock icon for time display options

Job colours

Each job takes the colour of the team member it's assigned to. Those colours are set per person in Team members — see Managing a team member. If two people are assigned, the job shows a split colour.